Rambler Tempe Construction Update: February 2026

By Kacey

Rambler Tempe continues to take shape as construction progresses toward an on-schedule August 2026 opening. With significant updates happening across units, amenities and exterior finishes, February brings another clear step forward in the transformation of the building.

This month’s update covers:

  • Exterior
  • Interior and Units
  • Amenity Areas

Exterior

The front entrance is nearing completion, with brickwork and window installation now finished. As exterior detailing wraps up, Rambler Tempe’s street presence is becoming more defined and polished, offering a first glimpse of the experience residents will have from the moment they walk up.

A modern multi-story building under construction with gray and brick exteriors. This construction update shows workers in safety gear near orange barriers along the sidewalk on a sunny day.

Front entrance brickwork and window installation completed at Rambler Tempe.

Interior and Units

All flooring in units is now complete, and floors 5–8 are currently being finalized for punch inspections. Lighting is fully operational on multiple residential floors, bringing the spaces to life and allowing final detailing to move forward efficiently. Penthouse units are also seeing backsplash and pendant lighting installation, adding a refined, elevated finish to these top-floor homes.

Modern kitchen with light wood cabinets, stainless steel appliances, a large island with a light gray countertop, pendant lights, and a window providing natural light—perfect for your next construction update.

Penthouse kitchen backsplash and pendant lighting installation in progress.

Modern, unfurnished apartment with light wood floors, an island with pendant lights, large floor-to-ceiling windows, and a ceiling fan, overlooking a cityscape with palm trees—perfect for those following the latest construction update.

Bright, modern finishes coming together inside Rambler Tempe units.

A stacked Whirlpool washer and dryer sit in a small, white laundry closet with a vent above—part of a recent construction update. The closet door is partially open, and both machines feature digital control panels.

Washer and dryer units are now in place through level 13.

A bright, empty room with light wood flooring, white walls, a ceiling fan with light, and a window letting in natural daylight provides a fresh look in this latest construction update.

Bedroom in Rambler Tempe, featuring installed ceiling fan and rolling blinds.

Amenity Areas

Wellness Spaces

Rambler Tempe’s wellness amenities are taking shape in a big way. Tiles have been placed in the sauna and cold plunge areas, with window views beginning to frame the experience. The red light therapy room has also been framed and is part of the growing recovery suite residents will enjoy.

In the courtyard, tile placement is complete, turf installation is underway and barrel saunas will soon be added, creating an outdoor wellness retreat in the heart of the building.

A wooden sauna interior with benches and a bucket with a ladle in the corner. Warm light highlights the smooth, natural wood panels covering the walls, benches, and ceiling—a stunning construction update for any relaxation space.

Sauna at Rambler Tempe with sauna wood now in place.

A mostly empty room with light-colored walls and tiled floors, featuring a doorway leading to a dark hallway. Sunlight shines in from the left, highlighting recent construction updates with bright patches on the floor.

Entrance to Rambler Tempe’s dedicated wellness space featuring a red light therapy room.

A modern apartment courtyard with artificial grass, a small circular fountain, and surrounding tall beige buildings. Caution tape and cones block off parts of the walkway, providing a clear construction update for residents.

Courtyard tile finished with turf currently being laid.

Pool Decks

The 14th-floor pool deck continues to progress, with hot tub tile installation underway and views becoming more visible as work advances. The 5th-floor pool deck is also taking shape, creating multiple elevated outdoor spaces for residents to relax and gather.

A jumbo screen installation is now in progress, setting the stage for future watch parties and rooftop events.

A rooftop construction area with an orange safety barrier, scattered materials, and a patterned wall. This construction update also shows modern apartment buildings, palm trees, and a clear blue sky in the background.

Hot tub tile coming together.

A construction update: Scaffolding surrounds a building with a bright green wall. In the foreground, an empty pool, construction materials, and orange safety barriers sit under a clear blue sky.

Rooftop jumbotron taking shape for future events.

Clubhouse & Daydreamer

The 5th-floor clubhouse is quickly transforming, with lighting turned on, upholstery completed and countertops installed. Bathrooms within the clubhouse are also nearing completion, bringing this social hub closer to its final form.

Daydreamer and the on-site bodega are progressing, along with the adjacent patio space creating a built-in coffee and convenience experience for residents.

A modern kitchen under renovation gets a construction update: unfinished countertops, brass sink and faucet, a glass tile backsplash, and four brass wall sconces with exposed bulbs. A microwave is seamlessly built into the lower cabinets.

Clubhouse upholstery and countertops currently underway.

Sunlight streams into an empty room with light wooden floors and large floor-to-ceiling windows, showcasing a panoramic cityscape view under a clear blue sky—a stunning highlight in this latest construction update.

Hardwood flooring completed in Rambler Tempe’s 14th-floor club room.

A spacious, unfinished room with covered furniture, large windows, a retro-style amber ceiling light, and protective floor coverings—a snapshot of a construction update in progress.

Completed lighting and tiling in the clubroom as flooring work continues.

An unfinished room under construction with drywall installed, exposed wiring hanging from the ceiling, unpainted walls, and construction materials on the floor. Plastic sheeting covers part of the back wall in this latest construction update.

Construction progress on the upcoming Daydreamer café space.

Construction update: A white wall with two recessed rectangular niches; the floor is unfinished concrete, and there are two small utility access panels and an electrical outlet in the right niche.

Wall cutouts for the Daydreamer bodega at Rambler Tempe.

Study & Fitness Areas

The study rooms and mezzanine are now receiving glass doors and painted accent walls, adding personality and warmth to these focused workspaces. Both the gym and study rooms have been fully painted, and the staircase framing in the fitness center is now in place. Water fountains are also being added throughout the common areas, and the parcel locker room is fully lit and nearing completion.

A modern interior under construction update features large glass walls marked by yellow tape in X shapes, brown trim, exposed concrete columns, and protective floor coverings. Natural light enters from the right side.

Glass doors and painted accent walls completed in the private study rooms.

A mostly empty room with large floor-to-ceiling windows offers a clear view of the cityscape under a blue sky. Sunlight casts shadows on the unfinished concrete floor—a paint bucket near the windows hints at an ongoing construction update.

Beautiful 14th-floor views of Tempe from the two-story fitness center.

A stainless steel drinking fountain and bottle filling station are installed against a wall with vertical brown tiles, flanked by two beige painted columns. As part of the recent construction update, exposed pipes and a security camera are visible above.

Common amenity spaces now feature water fountains.

Lobby Updates

The lobby fireplace is now installed, anchoring the space as a central design feature. With drywall complete and finishes going in, the lobby is beginning to reflect the welcoming atmosphere residents will experience daily. Nearby, a dedicated package room will include secure lockers for resident deliveries.

Construction update: A large indoor space under construction with exposed drywall, unfinished floors, ladders, and materials. A staircase leads to a mezzanine with black railings, while large windows fill the area with natural light.

Work continues on the Rambler Tempe lobby fireplace.

Construction update: Large, unfinished interior space with high ceilings, tall windows covered in plastic, and a black metal staircase with a landing leading to an upper floor. Construction materials and workers are visible on the ground.

Lobby staircase leading to the second-floor study mezzanine with completed railing.

Several light fixtures wrapped in plastic hang from the ceiling in an unfinished room, offering a clear construction update with bare walls and stacked boards scattered on the floor.

Rambler Tempe secure package room with newly installed lighting.

With unit flooring complete, elevators running, major amenity work underway and exterior finishes nearing completion, Rambler Tempe is entering its final construction stretch. Over the coming weeks you’ll see continued work on wellness amenities, rooftop spaces and detailed interior finishes.

Early move-in remains available beginning July 24, 2026 giving future residents the opportunity to settle in before the fall semester begins.

We’re excited to continue sharing the transformation as Rambler Tempe shifts from a construction site to a fully realized student living community ready to welcome its first residents this August.

If you’re ready to explore Rambler for yourself, schedule your hard hat tour today and get a look at what your future home near ASU could look like. You can also browse Rambler Tempe’s floor plans to find the layout that fits your lifestyle.

Kacey Ogden Rambler Tempe LMA headshot

Kacey

Kacey is a Leasing Manager for Rambler Tempe. She graduated from the University of Georgia with a degree in Digital Marketing. Her favorite drink to order at Daydreamer is an iced cookie butter latte with oat cold foam.

March 05, 2026

Be a Rambler Tempe VIP

Be the first to know about exclusive events, leasing updates, construction progress, promos and more.